Insights · November 23, 2026

AI-Based Predictive Maintenance Using Smart-Meter (AMI) Data

By Mohammad Hasan Imam, Executive Vice President, Oculin Tech BD Ltd., and PhD researcher in Computing

Utilities that have rolled out Advanced Metering Infrastructure (AMI) are sitting on one of the richest operational datasets in the power sector. Every smart meter reports consumption, voltage, events and alarms many times a day. Most of that data is used for one thing: billing. My doctoral research asks a broader question. Can the same data tell a utility where the next failure will happen, early enough to prevent it?

From reactive repair to prediction

Most distribution utilities still work reactively. A meter stops communicating, a transformer overheats or a feeder trips, and a crew is sent after customers are already affected. Preventive maintenance on a fixed schedule helps, but it spends money on healthy assets and still misses the ones that fail early.

Predictive maintenance sits between the two. Machine-learning models learn what normal behaviour looks like for each meter, transformer and feeder, then flag the patterns that tend to come before a fault. Maintenance is then planned for the assets that actually need it.

What smart-meter data can reveal

Why developing-country grids need a different approach

Most published work on AMI analytics comes from utilities with uniform meter fleets, reliable communications and clean historical data. That is not the reality in countries like Bangladesh, where the largest growth in smart metering is now happening. Here, models have to cope with:

Addressing this gap is the core of my research: to my knowledge, no prior study has applied AI-based predictive maintenance to utility-scale AMI in a developing-country setting such as Bangladesh.

A practical architecture

Utilities do not need a new platform to start. A workable approach builds on systems they already run:

  1. Collect interval data, events and alarms from the head-end system and Meter Data Management (MDM) platform, such as Oracle Utilities MDM or Customer-to-Meter (C2M).
  2. Clean and align data across vendors, map event codes to a common set, and link each meter to its transformer and feeder.
  3. Model normal behaviour per asset and score deviations, starting with interpretable methods before moving to deep learning.
  4. Act: push ranked alerts into the work-order process so field crews visit the highest-risk assets first.
  5. Learn: record what crews find on site, so the models improve with every inspection.

What utilities gain

The benefits are practical: fewer outages and shorter restoration times, lower technical and commercial losses, longer asset life, and better use of limited field crews. For customers, it means fewer interruptions and fewer billing disputes caused by faulty meters.

Conclusion

Smart meters were bought to improve billing. Used well, they can also become the early-warning system of the distribution grid. Building models that work under real-world constraints, with mixed vendors, patchy communications and limited history, is what will let utilities in developing countries capture that value.

More insights

Get in touch